Léger Robic Richard


The unusual design of using raised flooring throughout the space and installing mechanical and electrical distribution below the floor presented unique challenges in construction scheduling.

Mandate: General Contractor

Category: Legacy

Year: 2004

Schedule: 3 months (2004)

Area: 34,000 sq. ft.

Client: SITQ

Location: CDP Capital Centre, Montreal

Owner: SITQ

Designer: Moureaux Hauspy + Associés designers

Photographer: Claude-Simon Langlois